Well i have to say the week started bad... we got burgled...long story. then the days just kept on rolling while i tried to finish everything off before i leave for 2 weeks to go back to tech!
I went to site though on Monday and that was cool, to go out again and feel like a real architect. We had to go and take measurements and make sure of the existing plug points at the Freddy Hirsch Kitchen. To set up a full brief for the contractor with the Working Drawings. So i have pretty much concluded the working drawings for Freddy Hirsch for now they are meeting with the contractors today and Monday. The tenders just came back so they will be pricing everything today as well...Which probably means the drawings will change. But for now i got them out before i left.
Today i started a small new project its and alteration or more like an addition to a previous house they did. Its Rugby Road Alteration and they want a new scullery addition to there new kitchen. So iv got to finish these drawings by today before i leave because i wont be here for awhile. Therefore Ive got to get back to work...
till next time
sleezy , cheesy , blogger
MIMISA
Friday, October 21, 2011
Friday, October 14, 2011
Kitchens.....
So a pretty normal week , cant say much , not much to say. We had a normal Monday morning meeting and then i was on to the Freddy Hirsch Kitchen working drawings. I've been doing allot of kitchens lately, i think i can become an interior designer or possibly just a joiner.... I did some work on the Afonso House again this week, just a quick detail for the eng. or aluminium guy to price and manufacture.
So i suppose that was it for this week, still on the kitchen and not much else to say, its been a very quick and quiet week...
till next time
Sleezy , cheesy , blogger
MIMISA
So i suppose that was it for this week, still on the kitchen and not much else to say, its been a very quick and quiet week...
till next time
Sleezy , cheesy , blogger
MIMISA
Monday, October 10, 2011
7th oct weekly update
A new kitchen, still working on kitchens, but a new one this time. A new project was recieved last week and the clients are Freddy Hirsch, the spice people and we ahve to redo there Sencory Kitchen were they make and test all the foods and spices. So firstly it was getting the design approved from the presentation drawings. Then we are moving on to all the tender and working drawings aswell as electrical and ceiling drawings.
I have been getting back specs of appliances whole week to properly fit them into the kitchen and find a space for all of them in the design. There are about 14 differant appliances around this kitchen and i have been modeling them all and putting them in and re-designing around them. All in all it is a well put together kitchen with a solid modular concept.
Besides some barn work here and there that was it for this week.
till next time
sleesy, chessy, blogger
MIMISA
I have been getting back specs of appliances whole week to properly fit them into the kitchen and find a space for all of them in the design. There are about 14 differant appliances around this kitchen and i have been modeling them all and putting them in and re-designing around them. All in all it is a well put together kitchen with a solid modular concept.
Besides some barn work here and there that was it for this week.
till next time
sleesy, chessy, blogger