OK, sorry for the late blog, but last week was a bit strange i felt like i had to re-adjust back into the work environment after a week at tech and i was just out of swing.
I was back at work at Bomax Monday morning in the meeting, sitting with a bandaged finger and body aches from the weekend overnight hike, but ready do get back onto the Hemelzicht Farmhouse.
I soon got back onto the kitchen layout planning and design. Finishing off the drawings and joinery and setting up the scullery/pantry and laundry as well. During the week that i was at tech the house was handed over for construction which now calls for a whole new batch of drawings to issued. I then moved onto the electrical layouts making sure everything was ready and preparing it for construction. All the secondary structure working drawings as well as the fittings & fixtures drawings needs to be set up and done in time for construction. So i started setting up the staircase, built in fireplaces and some fixtures and fittings drawings. I then moved onto the Cellar and pool drawings, mostly just getting them ready for crit and then to move on from there. Then ill be onto the real construction and detailing of these items... :)
till next time
sleezy, cheezy, blogger
MIMISA
No comments:
Post a Comment