Ok so only four days of this week but not too bad on the work front. Lots of details, jumping from one project to the next but all having the same thing in common, the details. All the projects that are happenning here at the moment and that i am working on are all at round about that stage where the builder needs to see the construction details and needs to be issued "yesturday".
So it started with a pool detail and sections for construction on house Joubert, which had me scratching my head abit, about where the best location for the pump should be, and what the shadowline overhang pool surounds should be. but that took me about 2 days then it was on to the doors and windows schedule where everthing is custom made and we had to work out everthing so that it fitted in nicely and corrisponded with the overall design off the "very modern" house. The once the electrical guy finally sent the electrical referances fro all three floors, i could check it, prep it, and print/send for construction. Then i moved on to something i never did before, ceiling layouts and details. I nevr thought you did layouts for ceilings, i just thought you put it in. Well i learn something new everyday, apparently you need them when your ceiling is that complicated like this on is, or like most of them are here on these projects they work on. Lots of bulkheads and floating ceilings and shadowlines, which means lots of details on all three floors.
But all in all its been a good week and i just keep on learning.
till next time
sleezy, cheesy, blogger
MIMISA
No comments:
Post a Comment