The week was pretty up tight and stressfull with the boss man on me whole week to do this ground floor reception area for Oceana building, while Riaz gives me aother things to do, all on top of the fact that i never went to site when he said i must go.
I started the week with more Oceana joinery drawings and details, and thats when Dion told us that the reception needs to be issued. Then Riaz gave me more cieling details for Oceana to do for all the floors for the offices. Then i had to do the fire door schedule for the automated sliding fire doors, and then started with the ground floor reception.
So Riaz sets me up with the draing and i get started, then dion comes and gives me the most craziest crit ever, you never know where you are after Dion crits you, you just sort of sit there. So the crit he says alot of things, about what must go there and how it must fit, but he also says that he want to relocate the fire control panel into the desk aswel and seeing as we are not sure of its dimensions i sure go to site and have a look at it. But then at the same time he says that this drawing should be out asap. so how do i go to site and get the drawing out and can i just go to site by myself?
Anyway so friday comes and we have another crit and Dion goes crazy because this drawing needs to go out today and we are trying to confirm finishes. So i finished the drawing and we issued to tender for pricing. And then Doin wants to know why i didnt go to site? But when should i have gone and how?
So anyway no site visit but the drawing is out with a "to be confirmed on site" note attached to the fire control panel. oh well maybe next time.
Till next time
sleezy, cheesy, blogger