Saturday, July 16, 2011

Going to Site? Getting Drawings done?...

This week started and ended with long and tirering site visits. The Oceana building that we were working on is now coming to an end and we have been going to site continuously to try and sign the building off and complete the building completions list as soon as possible. We have to work through each floor all the time and check that everything is done and up to scratch. While back at the office lots of work is waiting for me to get back and finish them off. So how do you manage to get office work done when you have to go to site all the time. How do you balance it off? Where do you find time to do both, and pull them off seamlessly?

I was hard at work this week on the Winery proposal and barn drawings for the site in Hermanus, Called Hemelzight. The winery complex we are desighning is the second phase of the complex but when thay are all complete, our complex should resemble a quaint winery village. The Barn is the first phase of the complex and is quite interesting. It is a steel frame construction with tertairy walling with quite interesitng detailing and we are trying to pull it off with all low cost materials and goood architecture....

till next time
sleezy, cheesy, blogger
MIMISA

No comments:

Post a Comment