Working hard and quick and getting things done according to deadlines is the name of the game in architecture, but when you have to redo your work all the time because things change is not cool at all. Not to mention all the tech school work that needs to be done on top of that.
After Monday morning meeting which covered the weeks schedule, i was back on the barn to hopefully be finishing off the working drawings and then get onto the main Farmhouse. But things never go as planned and the barn is moving again so all my work goes down the toilet yet again. So we decided to leave any work on the barn until the position is finalised, and i move onto the main house. Most of the week i was going through the eng. drawings and making sure they correspond with ours and changing ours to reflect the eng. construction drawings and cleaning up the details. I then moved on to the electrical plans which were very cool and intense, where i learned new ways of doing electrical layouts and door schedules. I think these new methods are quite effective and work well, and improves the overall drawing.
Anyway so today is Friday and i was back at Oceana site de-snagging once again on my own, but i was only there from 8-ish til past lunch time today, and then i went back to the office to revise a drawing of a boundary wall in camps bay which is still causing problems. That Concluded my week and it was off to the week end were my school/tech work awaits.
till next time
sleesy, cheezy, blogger
MIMISA
No comments:
Post a Comment