Friday, September 9, 2011

Cellar Designing... :)

As decided on Monday I have been working on the Cellar of Hemelzight Main House as that would be one of the first things that will be built and it needs to be resolved and fully designed and detailed. So i have been drawing that up most of the week as well as the main staircase.

The main staircase is timber cladded with a steel frame, in the double volume space and is cantilevered from the feature concrete off-shutter wall. I have been doing working drawings and details for the stairs and cellar and preparing it to be presented to the client. Today, we have bben preparing all the drawings of the design variation that he has requested to present to him on monday aswell as the Cellar. I just hope he doesn't have anymore changes in mind, because i pretty much like the design as it is and it works well. So lets see what next week holds...

till next time
sleezy , Cheesy , blogger
MIMISA

No comments:

Post a Comment