A pretty good week,went very fast as they all do these days. Started as normal with the Hemelzight farmhouse, detailing the main staircase, then cellar and wall calculations for the ruin brick feature wall they want to do in the cellar. I had to Calculated the amount of Ruin bricks we need and if it would will the wall we are proposing to put it on. The eng. drawings had to be checked in correspondence with ours before we issued the working drawings for the Barn. So we did and it was issued.
So the working drawing were issued after some issues were resolved with problems with the eng. drawing. The the very next day it was re-issued due to late information coming though. Then without out fail the very next day it was issued again due to more LVL CHANGES... SO I Issued Working drawings and 2 sets of REVISIONS of the same drawings in the space of one week... busy week....... t b c..
til next time